Bottom-mounted or side-mounted: which one?
Choose the mounting surface around the workpiece, obstruction and tank structure, then verify the loaded result. Neither bottom nor side mounting guarantees uniform cleaning on its own.
Three checks
Check what sits between the bottom and the part
Bottom mounting is an arrangement to evaluate, not a promise of uniform action throughout the tank. Basket construction, support points and stacked workpieces can affect the useful exposure of the surfaces that matter. Mark those surfaces and likely obstructions on the loading drawing. Define how parts from different locations will be inspected against the same cleaning requirement. An apparently active empty bath does not establish performance with a production load. Keep the fixture configuration in the test record so that an accepted result can be repeated instead of depending on an undocumented placement.
Give side mounting a specific process purpose
Side-mounted radiation may be considered for a deeper tank or a particular region, but depth alone does not settle the choice. The tank structure, liquid level and workpiece orientation all need review. Explain which surfaces require exposure and where access is obstructed in the proposed layout. Include installation dimensions, maintenance access and the permitted operating liquid level in the discussion. The acceptance criterion is the result at the target surfaces within the approved structural conditions. Do not assume that adding a side-mounted assembly will correct every poorly cleaned location or make the existing bottom arrangement unnecessary.
Use an approved mounting process
Surface material, flatness, preparation and the chosen bonding or fastening method belong in the installation documentation. Do not invent sanding requirements, bond thickness, tightening torque or curing conditions from a generic guide. Ask the technical team for the drawing and written process applicable to the actual component and tank. Preserve material identification and inspection records during assembly. A clean-looking joint is not a substitute for a documented installation. Exact mounting dimensions, torque and processing limits remain subject to the approved specification or the technical department’s written assembly instructions.
Where this does not apply
This comparison applies to cleaning equipment with a defined installation design. It does not authorize modifying a pressure-containing or otherwise specialized vessel. Obtain the equipment supplier’s review before drilling, welding or changing a tank wall. An immersible assembly has its own installation and sealing requirements and should not inherit the process for an externally bonded component. Where a production machine already has a qualified layout, the change owner must decide what structural and process validation is required.
How to verify
Prepare a layout showing the workpieces, fixtures and liquid level, then ask the technical team to review candidate mounting surfaces. After an approved installation, place representative samples at the agreed critical locations and compare the cleaning and damage results. Record the fixture positions and assembly condition with the inspection report. If results vary, investigate obstruction and layout before proposing a change. Do not move bonded components or increase fastening torque as an improvised correction. Each revised arrangement should have a documented review and a repeatable acceptance trial. Include access for inspection and eventual replacement in the layout review. A successful prototype is difficult to maintain if the approved installation cannot be inspected or reproduced without changing the surrounding equipment or the workpiece fixture.