FAQ · Company & identity

What if the website, quotation and approved specification disagree?

Resolve the discrepancy before ordering against the disputed value. Confirm the same model revision and acceptance conditions across the documents.

Three checks

  1. Use the website to identify a candidate, then establish which revision the published data describes.

  2. A quotation should identify suffixes, options and referenced documents instead of naming only a broad product family.

  3. Keep the approved drawing and specification revision linked to the actual order.

Where this answer stops applying

The newest date on a document does not automatically override all previously agreed requirements.

How to verify

Send a line-by-line discrepancy list to sales and engineering and obtain one reconciled document set for purchasing and inspection.

Related questions

Basis & references

Editorial procurement checklist; confirm order-specific requirements with engineering.

Updated: 2026-11-21 · Sunnytec website editorial content; model-specific values require approved documentation.

Product center · Related application · All 60 questions · Ask a question / report a correction