FAQ · Purchasing & delivery

Does a material or drawing change require requalification?

Review changes that affect approved requirements and agree which checks or requalification are needed.

Three checks

  1. Identify changes in material, geometry, electrodes, process or associated equipment.

  2. Keep the old and new revisions and the effective batch identifiable.

  3. Plan checks for the characteristics affected by the change.

Where this answer stops applying

An unchanged outline does not prove unchanged electrical or assembly behavior.

How to verify

Tie the change notice to the affected requirements and batches, and complete the agreed release decisions before treating the revised item as an approved substitute.

Related questions

Basis & references

Editorial procurement checklist; confirm order-specific requirements with engineering.

Updated: 2026-11-21 · Sunnytec website editorial content; model-specific values require approved documentation.

Product center · Related application · All 60 questions · Ask a question / report a correction