FAQ · Purchasing & delivery

What should incoming inspection cover first?

Start with identity and physical condition, then measure the agreed characteristics using the accepted method.

Three checks

  1. Check model, batch, quantity and packaging condition.

  2. Inspect the ceramic, electrodes, connections and mounting features for abnormalities.

  3. Measure under the specified conditions and retain the original results.

Where this answer stops applying

Unapproved high-voltage or high-power tests should not be improvised as an incoming screen.

How to verify

Link receipt and measurement records to the batch, quarantine discrepancies and resolve them with the supplier before releasing the parts to production.

Related questions

Basis & references

Editorial procurement checklist; confirm order-specific requirements with engineering.

Updated: 2026-11-21 · Sunnytec website editorial content; model-specific values require approved documentation.

Product center · Related application · All 60 questions · Ask a question / report a correction