FAQ · Product selection

What tank information should I include with an inquiry?

Show the tank construction, working liquid level, radiating surfaces and loading arrangement so engineering can assess the actual system.

Three checks

  1. Separate internal dimensions, wall construction and proposed mounting areas on the drawing.

  2. Mark the basket, part locations and obstructions alongside the normal working level.

  3. Describe the liquid, temperature control and any existing generator.

Where this answer stops applying

Tank volume alone cannot determine the required transducer count or installed power.

How to verify

Send annotated plan and side views with representative workpiece and contamination photographs. Identify which dimensions are fixed and which may change during the equipment design.

Related questions

Basis & references

Editorial procurement checklist; confirm order-specific requirements with engineering.

Updated: 2026-11-21 · Sunnytec website editorial content; model-specific values require approved documentation.

Product center · Related application · All 60 questions · Ask a question / report a correction